engineering works

Engineering works: Utrecht - Amersfoort; Utrecht - Hilversum

Situation

Between Utrecht Overvecht and Hilversum buses are running due to engineering works.
Between Utrecht Centraal and Amersfoort Centraal the timetable has been changed due to engineering works.
The extra travel time is between 15 and 30 minutes.

Period

Between Saturday, September 16, 2023 1:10 AM hours and Monday, September 18, 2023 2:00 AM hours.

Advice

Passengers between Utrecht Centraal and Utrecht Overvecht travel via Bilthoven.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 16, 2023 1:10 AM and Monday, September 18, 2023 2:00 AM.