engineering works

Engineering works: Utrecht - Hilversum

Situation

Between Utrecht Centraal and Hilversum buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

On Sunday, October 1, 2023 between 4:30 AM and 7:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, October 1, 2023 4:30 AM and Sunday, October 1, 2023 7:00 AM.