Engineering works: Zwolle
Situation
From and to Zwolle buses are running due to engineering works.
The extra travel time is about 30 minutes.
Period
On Sunday, October 8, 2023 between 4:00 AM and 9:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 500 Groningen/Rotterdam C. - Rotterdam C./Groningen is cancelled between Meppel and 't Harde
- Intercity 600 Leeuwarden/Rotterdam C. - Rotterdam C./Leeuwarden is cancelled between Meppel and 't Harde
- Intercity 700 Groningen/Den Haag C. - Den Haag C./Groningen is cancelled between Meppel and Kampen Zuid
- Intercity 1800 Leeuwarden/Den Haag C. - Den Haag C./Leeuwarden is cancelled between Meppel and Kampen Zuid
- Intercity 3600 Roosendaal/Zwolle - Zwolle/Roosendaal is cancelled between Zwolle and Olst
- Sprinter 4600 Zwolle/Den Haag C. - Den Haag C./Zwolle is cancelled between Zwolle and Kampen Zuid
- Sprinter 5600 Zwolle/Utrecht C. - Utrecht C./Zwolle is cancelled between Zwolle and Nunspeet
- Sprinter 8100 Groningen/Zwolle - Zwolle/Groningen is cancelled between Zwolle and Meppel
- Local buses are running between Zwolle, Wezep and 't Harde.
- Local buses are running between Zwolle and Kampen Zuid.
- Local buses are running between Zwolle and Meppel.
- Local buses are running between Zwolle, Wezep, 't Harde and Nunspeet.
- Local buses are running between Zwolle, Wijhe and Olst.
- Local buses are running between Zwolle and Dalfsen.
- Local buses are running between 't Harde, Wezep and Zwolle.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, October 8, 2023 4:00 AM and Sunday, October 8, 2023 9:00 AM.