Engineering works: Leiden - Rotterdam; Schiphol - Leiden
Situation
Between Schiphol Airport and Leiden Centraal fewer intercities are running due to engineering works.
Between Leiden Centraal and Rotterdam Centraal fewer intercities are running due to engineering works.
The extra travel time is about 15 minutes.
Period
On Thursday, October 19, 2023 between 5:35 AM and 8:45 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2400 Dordrecht/Lelystad C. - Lelystad C./Dordrecht is cancelled between Schiphol Airport and Dordrecht
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, October 19, 2023 5:35 AM and Thursday, October 19, 2023 8:45 PM.