Engineering works: Amsterdam - Hannover - Berlin
Situation
Between Amsterdam Centraal and Bad Bentheim the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Monday, November 20, 2023 4:00 AM hours and Wednesday, November 22, 2023 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 140 to 149 Berlin Ostbhf/Hamm (Westf.) - Amsterdam C./Hamm (Westf.) is cancelled between Amsterdam Centraal and Bad Bentheim
- Intercity 240 to 249 Berlin Ostbhf/Amsterdam C. - Amsterdam C./Berlin Ostbhf is cancelled between Amsterdam Centraal and Bad Bentheim
- Buses are running between Hengelo and Bad Bentheim.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, November 20, 2023 4:00 AM and Wednesday, November 22, 2023 2:00 AM.