Engineering works: Enschede - Gronau - Dortmund
Situation
Between Lünen Hbf and Dortmund Hbf the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Friday, October 27, 2023 8:30 PM hours and Friday, November 10, 2023 9:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Lünen Hbf and Dortmund Hbf.
- Stoptrein 20200 to 20249 Dortmund Hbf/Lünen Hbf - Lünen Hbf/Dortmund Hbf is cancelled between Lünen Hbf and Dortmund Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Friday, October 27, 2023 8:30 PM and Friday, November 10, 2023 9:00 PM.