Engineering works: Amsterdam - Utrecht
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
Period
On Sunday, November 19, 2023 between 7:15 AM and 10:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3000 Nijmegen/Den Helder - Den Helder/Nijmegen is cancelled between Amsterdam Centraal and Utrecht Centraal
- Sprinter 7300 Rhenen/Breukelen - Breukelen/Rhenen is cancelled between Breukelen and Utrecht Centraal
- Sprinter 7400 Driebergen-Zeist/Uitgeest - Uitgeest/Driebergen-Zeist runs as extra service between Amsterdam Centraal and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, November 19, 2023 7:15 AM and Sunday, November 19, 2023 10:30 AM.