Engineering works: Den Haag - Rotterdam
Situation
Between Schiedam Centrum and Rotterdam Centraal buses are running due to engineering works.
The extra travel time may be up to 15 minutes.
Period
In the night from Sunday to Monday, November 20, 2023 between 12:20 AM and 5:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Schiedam Centrum and Rotterdam Centraal.
- Intercity 1400 Utrecht C./Rotterdam C. - Rotterdam C./Utrecht C. is cancelled between Schiedam Centrum and Rotterdam Centraal
- Intercity 2200 Vlissingen/Amsterdam C. - Amsterdam C./Vlissingen is cancelled between Schiedam Centrum and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, November 20, 2023 12:20 AM and Monday, November 20, 2023 5:00 AM.