engineering works

Engineering works: Breda

Situation

From and to Breda buses are running due to engineering works.
The extra travel time may be up to 45 minutes.

Period

Between Saturday, January 27, 2024 7:30 PM hours and Sunday, January 28, 2024 11:15 AM hours.

Advice

Passengers between Den Haag Centraal and Eindhoven Centraal travel via Utrecht Centraal.
Passengers between Rotterdam Centraal and Eindhoven Centraal travel via Utrecht Centraal.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, January 27, 2024 7:30 PM and Sunday, January 28, 2024 11:15 AM.