Flooding: Enschede - Gronau - Dortmund
Situation
Between Lünen Hbf and Dortmund Hbf the international timetable has been changed due to flooding.
There is no additional travel time..
Period
Between Thursday, January 4, 2024 9:30 AM hours and Monday, January 15, 2024 11:59 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Lünen Hbf and Dortmund Hbf.
- Stoptrein 20200 to 20249 Lünen Hbf/Dortmund Hbf - Dortmund Hbf/Lünen Hbf is cancelled between Lünen Hbf and Dortmund Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Thursday, January 4, 2024 9:30 AM and Monday, January 15, 2024 11:59 PM.