Staffing problems: Heerlen - Aachen Hbf
Situation
Between Heerlen and Aachen Hbf buses are running due to a staff shortage.
The extra travel time is more than 30 minutes.
Period
On Friday, January 5, 2024 between 12:00 PM and 12:20 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sneltrein 18900 Aachen Hbf/Maastricht - Maastricht/Aachen Hbf is cancelled between Heerlen and Aachen Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Friday, January 5, 2024 12:00 PM and Friday, January 5, 2024 12:20 PM.