Engineering works: Amsterdam - Hannover - Berlin
Situation
Between Oldenzaal and Bad Bentheim the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
On Monday, February 5, 2024 between 7:45 AM and 10:15 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 140 to 149 Berlin Ostbhf/Amsterdam C. - Amsterdam C./Berlin Ostbhf is cancelled between Amsterdam Centraal and Amersfoort Centraal (only in direction of Amersfoort Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, February 5, 2024 7:45 AM and Monday, February 5, 2024 10:15 AM.