Engineering works elsewhere: Utrecht - Almere
Situation
Between Utrecht Centraal and Almere Centrum the timetable has been changed due to engineering works elsewhere.
There is no additional travel time..
Period
Between Saturday, February 3, 2024 7:00 AM hours and Monday, February 5, 2024 12:00 AM hours.
Advice
The IC between Utrecht Central and Zwolle runs via Hilversum and Almere Centrum.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5700 Hoofddorp/Utrecht C. - Utrecht C./Hoofddorp runs as extra service between Utrecht Centraal and Hilversum
- Sprinter 14900 Almere C./Utrecht C. - Utrecht C./Almere C. is cancelled between Utrecht Centraal and Almere Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, February 3, 2024 7:00 AM and Monday, February 5, 2024 12:00 AM.