engineering works

Engineering works: Roermond - Sittard

Situation

Between Roermond and Echt buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, February 17, 2024 4:00 AM hours and Monday, February 19, 2024 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Saturday, February 17, 2024 4:00 AM to Saturday, February 17, 2024 1:30 PM
  • Sunday, February 18, 2024 8:30 PM to Monday, February 19, 2024 2:00 AM