Engineering works: Zwolle
Situation
From and to Zwolle the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, February 17, 2024 4:00 AM hours and Sunday, February 18, 2024 2:00 AM hours.
Advice
Please note! Maintenance works are taking place between Zwolle and Deventer until February 25th.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Deventer and Meppel.
- Express buses are running between Zwolle, Wezep, 't Harde and Nunspeet.
- Express buses are running between Zwolle and Meppel.
- Express buses are running between Zwolle and Kampen Zuid.
- Local buses are running between Zwolle, Heino and Raalte.
- Intercity 500 Groningen/Rotterdam C. - Rotterdam C./Groningen is cancelled between Zwolle and Meppel
- Intercity 600 Leeuwarden/Rotterdam C. - Rotterdam C./Leeuwarden is cancelled between Zwolle and Meppel
- Intercity 700 Groningen/Den Haag C. - Den Haag C./Groningen is cancelled between Zwolle and Meppel
- Intercity 1800 Leeuwarden/Den Haag C. - Den Haag C./Leeuwarden is cancelled between Zwolle and Meppel
- Sprinter 7900 to 7995 Enschede/Zwolle - Zwolle/Enschede is cancelled between Zwolle and Raalte
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, February 17, 2024 4:00 AM and Sunday, February 18, 2024 2:00 AM.