Engineering works: Ede-Wageningen
Situation
From and to Ede-Wageningen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Tuesday, February 20, 2024 4:00 AM hours and Friday, February 23, 2024 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Driebergen-Zeist and Arnhem Centraal.
- Local buses are running between Driebergen-Zeist, Ede-Wageningen and Arnhem Centraal.
- Local buses are running between Veenendaal-De Klomp and Ede-Wageningen.
- Local buses are running between Ede-Wageningen and Wolfheze.
- Local buses are running between Barneveld Zuid, Lunteren, Ede Centrum and Ede-Wageningen.
- Intercity 1500 Amersfoort C./Amsterdam C. - Amsterdam C./Amersfoort C. runs as extra service between Amersfoort Centraal and Deventer
- Intercity 3000 Nijmegen/Den Helder - Den Helder/Nijmegen is cancelled between Driebergen-Zeist and Arnhem Centraal
- Intercity 3200 Arnhem C./Rotterdam C. - Rotterdam C./Arnhem C. is cancelled between Utrecht Centraal and Arnhem Centraal
- Sprinter 7500 Arnhem C./Ede-Wageningen - Ede-Wageningen/Arnhem C. is cancelled between Ede-Wageningen and Wolfheze
- Sprinter 31300 to 31395 Ede-Wageningen/Amersfoort C. - Amersfoort C./Ede-Wageningen is cancelled between Ede-Wageningen and Barneveld Zuid
- Intercity 203000 Arnhem C./Nijmegen - Nijmegen/Arnhem C. runs as extra service between Arnhem Centraal and Nijmegen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Tuesday, February 20, 2024 4:00 AM and Friday, February 23, 2024 2:00 AM.