Engineering works: Lelystad - Zwolle
Situation
Between Kampen Zuid and Zwolle buses are running due to engineering works.
Between Zwolle and Lelystad Centrum buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Thursday, March 14, 2024 11:30 PM hours and Friday, March 15, 2024 1:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Kampen Zuid and Zwolle.
- Local buses are running between Zwolle, Kampen Zuid, Dronten and Lelystad Centrum.
- Sprinter 9000 Leeuwarden/Lelystad C. - Lelystad C./Leeuwarden is cancelled between Lelystad Centrum and Zwolle
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, March 14, 2024 11:30 PM and Friday, March 15, 2024 1:00 AM.