Engineering works elsewhere: Schiphol - Lelystad
Situation
Between Schiphol Airport and Lelystad Centrum fewer intercities are running due to engineering works elsewhere.
The extra travel time is about 15 minutes.
Period
Between Monday, February 19, 2024 6:00 AM hours and Thursday, February 22, 2024 8:00 PM hours.
Advice
During rush hours, there are fewer Intercity trains running between Schiphol Airport and Lelystad Centrum.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2400 Dordrecht/Lelystad C. - Lelystad C./Dordrecht is cancelled between Schiphol Airport and Lelystad Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, February 19, 2024 6:00 AM and Thursday, February 22, 2024 8:00 PM.