engineering works

Engineering works: Utrecht - Den Haag

Situation

Between Gouda and Den Haag Ypenburg buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Saturday, April 13, 2024 5:00 AM hours and Saturday, April 20, 2024 11:50 AM hours.

Advice

Passengers between Gouda and Den Haag Centraal travel via Rotterdam Centraal.
Passengers between Utrecht Centraal and Den Haag Centraal travel via Leiden Centraal.
Due to crowds, avoid traveling during peak hours. On Saturday 20th of April until 11:50 AM, NS buses are also operating between Den Haag Centraal and Ypenburg.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, April 13, 2024 5:00 AM and Saturday, April 20, 2024 11:50 AM.