Engineering works: Lelystad - Zwolle
Situation
Between Lelystad Centrum and Zwolle the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Thursday, April 11, 2024 11:30 PM hours and Friday, April 12, 2024 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Kampen Zuid and Zwolle.
- Local buses are running between Zwolle, Kampen Zuid, Dronten and Lelystad Centrum.
- Intercity 500 Rotterdam C./Groningen - Groningen/Rotterdam C. is cancelled between Zwolle and Groningen (only in direction of Groningen)
- Intercity 600 Rotterdam C./Leeuwarden - Leeuwarden/Rotterdam C. is cancelled between Meppel and Zwolle (only in direction of Zwolle)
-
Sprinter
9000
Lelystad C./Leeuwarden - Leeuwarden/Lelystad C.
- is cancelled between Kampen Zuid and Zwolle (only in direction of Zwolle)
- is cancelled between Zwolle and Lelystad Centrum (only in direction of Lelystad Centrum)
- Sprinter 709000 Lelystad C./Kampen Zuid - Kampen Zuid/Lelystad C. runs as extra service between Kampen Zuid and Lelystad Centrum (only in direction of Lelystad Centrum)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, April 11, 2024 11:30 PM and Friday, April 12, 2024 2:00 AM.