Engineering works: Utrecht - Spoorwegmuseum
Situation
Between Utrecht Centraal and Utrecht Maliebaan buses are running due to engineering works.
There is no additional travel time..
Period
On Sunday, June 23, 2024 between 9:15 AM and 6:00 PM hours.
Advice
Train to Railway Museum cannot operate. Every half hour a bus will depart from 09.30 onwards.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Centraal and Utrecht Maliebaan.
- Speciale Trein 28300 Utrecht C./Maliebaan - Maliebaan/Utrecht C. is cancelled between Utrecht Centraal and Utrecht Maliebaan
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, June 23, 2024 9:15 AM and Sunday, June 23, 2024 6:00 PM.