Engineering works: Amsterdam - Schiphol - Rotterdam
Situation
Between Amsterdam Centraal and Schiphol Airport there are fewer trains running due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, June 29, 2024 4:00 AM hours and Tuesday, July 2, 2024 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Breda/Amsterdam C. - Amsterdam C./Breda runs today from/to Amsterdam Zuid between Rotterdam Centraal and Amsterdam Centraal
- Intercity direct 1000 Rotterdam C./Amsterdam C. - Amsterdam C./Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 29, 2024 4:00 AM and Tuesday, July 2, 2024 2:00 AM.