Engineering works: Lelystad - Zwolle
Situation
Between Zwolle and Kampen Zuid a bus service is available due to engineering works.
The extra travel time is about 30 minutes.
Period
In the night from Thursday to Friday, June 14, 2024 between 12:20 AM and 1:20 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- A bus is running between Zwolle, Kampen Zuid, Dronten and Lelystad Centrum.
- Sprinter 9000 Lelystad C./Leeuwarden - Leeuwarden/Lelystad C. is cancelled between Zwolle and Lelystad Centrum (only in direction of Lelystad Centrum)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, June 14, 2024 12:20 AM and Friday, June 14, 2024 1:20 AM.