Engineering works: Lelystad - Zwolle
Situation
Between Kampen Zuid and Zwolle buses are running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Wednesday, June 26, 2024 11:30 PM hours and Thursday, June 27, 2024 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- A bus is running between Kampen Zuid and Zwolle.
- Sprinter 9000 Lelystad C./Leeuwarden - Leeuwarden/Lelystad C. is cancelled between Zwolle and Kampen Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, June 26, 2024 11:30 PM and Thursday, June 27, 2024 2:00 AM.