Engineering works: Zwolle - Groningen; Lelystad - Zwolle; Zwolle - Leeuwarden
Situation
Between Zwolle and Meppel the timetable has been changed due to engineering works.
Between Zwolle and Kampen Zuid buses are running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Wednesday, July 10, 2024 11:30 PM hours and Thursday, July 11, 2024 12:20 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Zwolle and Kampen Zuid.
- Intercity 500 Rotterdam C./Groningen - Groningen/Rotterdam C. is cancelled between Zwolle and Meppel (only in direction of Meppel)
- Intercity 600 Rotterdam C./Leeuwarden - Leeuwarden/Rotterdam C. is cancelled between Meppel and Zwolle (only in direction of Zwolle)
- Intercity 700 Den Haag C./Groningen - Groningen/Den Haag C. is cancelled between Meppel and Kampen Zuid (only in direction of Kampen Zuid)
- Intercity 1800 Den Haag C./Leeuwarden - Leeuwarden/Den Haag C. is cancelled between Kampen Zuid and Meppel (only in direction of Meppel)
- Sprinter 9000 Lelystad C./Leeuwarden - Leeuwarden/Lelystad C. is cancelled between Kampen Zuid and Zwolle
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, July 10, 2024 11:30 PM and Thursday, July 11, 2024 12:20 AM.