Engineering works elsewhere: Utrecht - Almere
Situation
Between Utrecht Centraal and Almere Centrum the timetable has been changed due to engineering works elsewhere.
There is no additional travel time..
Period
Between Monday, July 15, 2024 6:00 AM hours and Monday, July 29, 2024 1:00 AM hours.
Advice
Sprinters Utrecht-Almere are not running. Use the diverted Intercity Utrecht-Almere-Zwolle-Groningen.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 500 Rotterdam C./Groningen - Groningen/Rotterdam C. is being diverted and will make an extra call at Hilversum, Naarden-Bussum and Almere Centrum between Utrecht Centraal and Groningen
- Intercity 600 Rotterdam C./Leeuwarden - Leeuwarden/Rotterdam C. is being diverted and will make an extra call at Hilversum, Naarden-Bussum and Almere Centrum between Utrecht Centraal and Leeuwarden
- Sprinter 4900 Almere C./Utrecht C. - Utrecht C./Almere C. is cancelled between Utrecht Centraal and Almere Centrum
- Sprinter 14900 Almere C./Utrecht C. - Utrecht C./Almere C. is cancelled between Utrecht Centraal and Almere Centrum
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, July 15, 2024 6:00 AM and Monday, July 29, 2024 1:00 AM.