engineering works

Engineering works: Amsterdam - Schiphol - Rotterdam

Situation

Between Schiphol Airport and Rotterdam Centraal no trains are running on the high-speed line due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Saturday, September 28, 2024 4:00 AM hours and Monday, September 30, 2024 2:00 AM hours.

Advice

Passengers between Schiphol Airport and Rotterdam Centraal travel via Leiden Centraal.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 28, 2024 4:00 AM and Monday, September 30, 2024 2:00 AM.