Engineering works: Amsterdam - Schiphol - Rotterdam
Situation
Between Schiphol Airport and Rotterdam Centraal no trains are running on the high-speed line due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, September 28, 2024 4:00 AM hours and Monday, September 30, 2024 2:00 AM hours.
Advice
Passengers between Schiphol Airport and Rotterdam Centraal travel via Leiden Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C./Breda - Breda/Amsterdam C. is cancelled between Amsterdam Centraal and Breda
- Intercity direct 1000 Amsterdam C./Rotterdam C. - Rotterdam C./Amsterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 28, 2024 4:00 AM and Monday, September 30, 2024 2:00 AM.