Engineering works: Breda - Tilburg
Situation
Between Breda and Tilburg buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, September 22, 2024 9:30 PM hours and Monday, September 23, 2024 5:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Breda, Gilze-Rijen and Tilburg.
- Local buses are running between Breda, Gilze-Rijen, Tilburg Reeshof, Tilburg Universiteit and Tilburg.
- Express buses are running between Breda, Gilze-Rijen and Tilburg.
- Intercity 1100 to 1111 Eindhoven C./Breda - Breda/Eindhoven C. is cancelled between Breda and Eindhoven Centraal
- Intercity 3600 Zwolle/Roosendaal - Roosendaal/Zwolle is cancelled between Breda and Tilburg
- Sprinter 6400 Tilburg Uni./Weert - Weert/Tilburg Uni. is cancelled between Tilburg Universiteit and Tilburg
- Sprinter 6600 Arnhem C./Dordrecht - Dordrecht/Arnhem C. is cancelled between Breda and Tilburg
- Express buses are running between Tilburg, Breda, Etten-Leur and Roosendaal.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Sunday, September 22, 2024 9:30 PM and Monday, September 23, 2024 5:30 AM.