engineering works

Engineering works: Roosendaal - Vlissingen

Situation

Between Roosendaal and Vlissingen buses are running due to engineering works.
The extra travel time is about 60 minutes.

Period

Between Sunday, September 22, 2024 11:20 PM hours and Monday, September 23, 2024 5:35 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, September 22, 2024 11:20 PM and Monday, September 23, 2024 5:35 AM.