planned maintenance

Planned maintenance: Amersfoort - Barneveld

Situation

Between Amersfoort Centraal and Barneveld Zuid the timetable has been changed due to planned maintenance.
There is no additional travel time..

Period

Between Saturday, September 21, 2024 4:00 AM hours and Sunday, September 22, 2024 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 21, 2024 4:00 AM and Sunday, September 22, 2024 2:00 AM.