Engineering works on the high-speed line: Schiphol - Rotterdam
Situation
Between Hoofddorp and Rotterdam Centraal no trains are running on the high-speed line due to engineering works on the high-speed line.
The extra travel time is about 30 minutes.
Period
Between Saturday, December 7, 2024 4:00 AM hours and Monday, December 9, 2024 2:00 AM hours.
Advice
Passengers between Schiphol Airport and Rotterdam Centraal travel via Den Haag HS.
Use the additional Intercity Amsterdam C-Rotterdam C via Schiphol, Leiden C and Den Haag HS.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Breda is cancelled between Amsterdam Centraal and Rotterdam Centraal
- Intercity direct 1000 Amsterdam C. - Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
- Intercity direct 9200 to 9211 Amsterdam C. - Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 7, 2024 4:00 AM and Monday, December 9, 2024 2:00 AM.