engineering works

Engineering works: Utrecht - Amersfoort Schothorst; Schiphol - Amersfoort; Amsterdam - Amersfoort

Situation

Between Amsterdam Centraal and Amersfoort Centraal the timetable has been changed due to engineering works.
Between Schiphol Airport and Amersfoort Centraal the timetable has been changed due to engineering works.
Between Amersfoort Centraal and Amersfoort Schothorst the timetable has been changed due to engineering works.
There is no additional travel time..

Period

Between Saturday, December 14, 2024 12:50 AM hours and Monday, December 16, 2024 1:40 AM hours.

Advice

Passengers between Amersfoort Centraal and Amsterdam Centraal and Schiphol Airport travel via Utrecht Centraal.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, December 14, 2024 12:50 AM and Monday, December 16, 2024 1:40 AM.