Engineering works: Utrecht - Hilversum
Situation
Between Utrecht Centraal and Hilversum buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
On Sunday, January 19, 2025 between 1:30 AM and 7:30 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1400 Utrecht C. - Rotterdam C. is diverted and will not call at Hilversum between Utrecht Centraal and Rotterdam Centraal
- Sprinter 4900 Almere C. - Utrecht C. is cancelled between Utrecht Centraal and Hilversum
- Local buses are running between Utrecht Centraal, Utrecht Overvecht, Hollandsche Rading, Hilversum Sportpark and Hilversum.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 19, 2025 1:30 AM and Sunday, January 19, 2025 7:30 AM.