Engineering works: Den Haag - Rotterdam - Eindhoven
Situation
Between Den Haag Centraal and Rotterdam Centraal the timetable has been changed due to engineering works.
Between Rotterdam Centraal and Breda fewer intercities are running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Saturday, January 18, 2025 4:00 AM hours and Monday, January 20, 2025 2:00 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1100 to 1111 Den Haag C. - Eindhoven C. is cancelled between Den Haag Centraal and Eindhoven Centraal
- Intercity direct 1800 Schothorst - Breda is cancelled between Rotterdam Centraal and Breda
- Intercity direct 2400 Lelystad C. - Rotterdam C. runs as extra service between Rotterdam Centraal and Eindhoven Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, January 18, 2025 4:00 AM and Monday, January 20, 2025 2:00 AM.