engineering works

Engineering works: Almere - Lelystad

Situation

Between Almere Centrum and Lelystad Centrum the timetable has been changed due to engineering works.
There is no additional travel time..

Period

Between Saturday, February 8, 2025 5:20 AM hours and Monday, February 10, 2025 1:30 AM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, February 8, 2025 5:20 AM and Monday, February 10, 2025 1:30 AM.