Line Hamm (Westf.)–Venlo

Information about the railway line between Hamm (Westf.) and Venlo, including the current service status for this line, a list of upcoming engineering works, and recent disruptions between Hamm (Westf.) and Venlo.

Trains on this line are operated by eurobahn. More information about ticket prices between Hamm (Westf.) and Venlo.

Current situation

Engineering works
There are engineering works taking place between Hamm (Westf.) and Venlo.
engineering works
Venlo - Mönchengladbach - Düsseldorf
active
engineering works
November 1, 2024 8:45 PM - November 24, 2024 11:00 PM

Route

  1. Hamm (Westf.)
  2. Bönen
  3. Unna
  4. Holzwickede
  5. Schwerte (Ruhr)
  6. Hagen Hbf
  7. Ennepetal
  8. Schwelm
  9. Wuppertal-Oberbarmen
  10. Wuppertal-Barmen
  11. Wuppertal Hbf
  12. Düsseldorf Hbf
  13. Neuss Hbf
  14. Mönchengladbach Hbf
  15. Viersen
  16. Dülken
  17. Boisheim
  18. Breyell
  19. Kaldenkirchen
  20. Venlo

Statistics for this line

Statistics for this line are calculated over the past 24 months.

Between December 1, 2022 and November 30, 2024, Rijden de Treinen has reported 126 disruptions on the line Hamm (Westf.)–Venlo. On average 0 disruptions per day.

The average duration for disruptions on this line is 4 hours, 3 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions between Hamm (Westf.) and Venlo, and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.

Main causes for disruption

In order to better understand the main causes for disruptions, Rijden de Treinen uses categories. You can see how disruptions are categorized.

This graph shows the number of disruptions per category.

Exact causes for disruption

This graph shows the various causes for a disruption and the number of disruptions with these causes. The causes for disruptions are provided by NS.