Sneltrein 18953 to Heerlen on July 22, 2023
This is the history of Sneltrein 18953 which ran from Aachen Hbf to Heerlen on July 22, 2023. The highest delay for this service was 6 minutes. This train was operated by Arriva. The total journey time for this train service was 27 minutes.
Below, you'll find the entire route for this train, including platform changes and (if available) the train composition for this day. Platform changes are marked.
* Statistics based on past 14 days
Punctuality for this train
Next to each station, you'll find some basic statistics about this train's punctuality at this station.
This is based on the performance of this train in the past 14 days. The percentage of trains which have departed or arrived on-time includes all trains which had a maximum delay of 4 minutes and 59 seconds. Cancelled trains are not considered as on-time trains.
Many more statistics about this train are available in our statistics section. See all train statistics and punctuality for Sneltrein 18953.