Sneltrein 13826 to Zwolle on December 21, 2023

This is the history of Sneltrein 13826 which ran from Emmen to Zwolle on December 21, 2023. This train ran almost without any delays. This train was operated by Blauwnet. The total journey time for this train service was 50 minutes.

Below, you'll find the entire route for this train, including platform changes and (if available) the train composition for this day. Platform changes are marked.

Arr.
Dep.
Station
Platform

* Statistics based on past 14 days

Punctuality for this train

Next to each station, you'll find some basic statistics about this train's punctuality at this station.

This is based on the performance of this train in the past 14 days. The percentage of trains which have departed or arrived on-time includes all trains which had a maximum delay of 4 minutes and 59 seconds. Cancelled trains are not considered as on-time trains.

Many more statistics about this train are available in our statistics section. See all train statistics and punctuality for Sneltrein 13826.

Train drawings: © Arthur Pijpers, Wiek Vlasma and others