rijp - bovenleiding

Overhead wires covered with frost: Amersfoort-Ede-Wageningen (17 December 2017)

  1. Disruption resolved Last update

    Between Amersfoort and Ede-Wageningen the train traffic is fully resumed.

  2. Delays decreasing

    Between Amersfoort and Ede-Wageningen the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 11:30 AM hours.

  3. Delays decreasing

    Between Amersfoort and Ede-Wageningen the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 11:30 AM hours.

    Train measures

    • Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
  4. Update

    Between Amersfoort and Ede-Wageningen no trains are running due to overhead wires covered with frost.
    It is not known yet how long this will take.

    Advice

    Local buses are running between Amersfoort, Hoevelaken, Barneveld Noord, Barneveld Centrum, Barneveld Zuid, Lunteren, Ede Centrum and Ede-Wageningen.

    Train measures

    • Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
  5. Update

    Between Barneveld Centrum and Ede-Wageningen no trains are running due to overhead wires covered with frost.
    It is not known yet how long this will take.

    Advice

    Local buses are running between Barneveld Centrum, Barneveld Zuid, Lunteren, Ede Centrum and Ede-Wageningen.

    Train measures

    • Stoptrein 31300 Amersfoort - Ede-Wageningen is cancelled between Barneveld Centrum and Ede-Wageningen
  6. Update

    Between Barneveld Centrum and Ede-Wageningen no trains are running due to overhead wires covered with frost.
    It is not known yet how long this will take.

  7. Disruption

    Between Hoevelaken and Ede-Wageningen there is a service disruption due to overhead wires covered with frost.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 7:45 AM on December 17, 2017 and took 3 hours, 45 minutes in total.

For statistics, this disruption is caused due to overhead wires covered with frost.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Connexxion.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights