Disruption cause: overhead wires covered with frost

This page shows more information about this disruption cause.

This disruption cause has been categorized under Weather influences.


Statistics

Statistics for this cause are calculated over the past 24 months.

Between May 1, 2023 and April 30, 2025, Rijden de Treinen has reported 21 disruptions caused due to overhead wires covered with frost. On average 0 disruptions per day.
The average duration for this cause is 2 hours, 45 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to overhead wires covered with frost and the total duration of these disruptions (measured in hours).