spoorproblemen buitenland

Railway problems abroad: Venlo-Mönchengladbach-Düsseldorf (22 April 2021)

  1. Disruption resolved Last update

    Between Venlo and Kaldenkirchen the train traffic is fully resumed.

  2. Delays decreasing

    Between Venlo and Kaldenkirchen the restrictions are resolved.
    Delays are decreasing.
    This will take until at least 4:00 AM hours.

    Train measures

    • Sneltrein 20060-20099 Venlo - Hamm (Westf.) is cancelled between Venlo and Kaldenkirchen
  3. Update

    Between Venlo and Kaldenkirchen no trains are running due to railway problems abroad.
    The extra travel time is more than 60 minutes.
    It is not known yet how long this will take.

    Train measures

    • Sneltrein 20060-20099 Venlo - Hamm (Westf.) is cancelled between Venlo and Kaldenkirchen
  4. Disruption

    Between Venlo and Kaldenkirchen no trains are running due to railway problems abroad.
    The extra travel time may be up to 60 minutes.
    It is not known yet how long this will take.

    Train measures

    • Sneltrein 20060-20099 Venlo - Hamm (Westf.) is cancelled between Venlo and Kaldenkirchen

More about this disruption

Statistics

This disruption started at 3:51 AM on April 22, 2021 and took 5 minutes in total.

For statistics, this disruption is caused due to railway problems abroad.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by eurobahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights