Problems with the rolling stock: Venlo-Mönchengladbach-Düsseldorf (7 February 2022)
-
Disruption resolved Last update
Between Venlo and Mönchengladbach Hbf the train traffic is fully resumed.
-
Delays decreasing
Between Venlo and Mönchengladbach Hbf the restrictions are resolved.
Delays are decreasing.
Service is normal around 9:30 PM hours. -
Update
Between Venlo and Mönchengladbach Hbf there are fewer local trains running due to problems with the rolling stock.
This will take until approximately 9:30 PM hours.Train measures
- Sneltrein 20060-20099 Venlo - Hamm (Westf.) runs less often between Venlo and Mönchengladbach Hbf
-
Update
Between Venlo and Mönchengladbach Hbf there are fewer local trains running due to problems with the rolling stock.
This will take until approximately 9:30 PM hours.Train measures
- Stoptrein 20000-20049 Arnhem C. - Duisburg Hbf - Düsseldorf Hbf runs less often between Venlo and Mönchengladbach Hbf
-
Disruption resolved
Between Venlo and Mönchengladbach Hbf the train traffic is fully resumed.
-
Disruption
Between Venlo and Mönchengladbach Hbf there are fewer trains running due to logistical limitations.
The extra travel time is about 60 minutes.
This will take at least until 10:30 PM hours.Train measures
- Stoptrein 20000-20049 Arnhem C. - Duisburg Hbf - Düsseldorf Hbf runs less often between Venlo and Mönchengladbach Hbf
More about this disruption
Statistics
This disruption started at 4:38 PM on February 7, 2022 and took 3 days, 4 hours, 51 minutes in total.
For statistics, this disruption is caused due to problems with the rolling stock.
Operators
This disruption affects trains operated by eurobahn.
Got delayed due to this disruption? You may be reimbursed.