spoorproblemen buitenland

Railway problems abroad: Venlo-Mönchengladbach-Düsseldorf (9 February 2022)

  1. Disruption resolved Last update

    Between Venlo and Mönchengladbach Hbf the train traffic is fully resumed.

  2. Update

    Between Venlo and Mönchengladbach Hbf there are fewer trains running due to railway problems abroad.
    The extra travel time is about 60 minutes.
    This will take at least until 11:00 PM hours.

    Train measures

    • Sneltrein 20060-20099 Venlo - Hamm (Westf.) runs less often between Venlo and Mönchengladbach Hbf
  3. Disruption

    Between Venlo and Mönchengladbach Hbf there are fewer trains running due to railway problems abroad.
    The extra travel time is about 60 minutes.
    This will take at least until 11:00 PM hours.

    Train measures

    • Stoptrein 20000-20049 Arnhem C. - Duisburg Hbf - Düsseldorf Hbf runs less often between Venlo and Mönchengladbach Hbf

More about this disruption

Statistics

This disruption started at 11:29 AM on February 9, 2022 and took 11 hours, 29 minutes in total.

For statistics, this disruption is caused due to railway problems abroad.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by eurobahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights