Engineering works: Venlo - Mönchengladbach - Düsseldorf
Situation
Between Venlo and Düsseldorf Hbf the international timetable has been changed due to engineering works.
The extra travel time may be up to 15 minutes.
Period
Between Wednesday, May 26, 2021 9:00 PM hours and Thursday, June 3, 2021 11:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Stoptrein 20000 to 20049 Arnhem C. - Duisburg Hbf - Düsseldorf Hbf does not call at Neuss Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Wednesday, May 26, 2021 9:00 PM and Thursday, June 3, 2021 11:00 PM.