Engineering works: Venlo - Mönchengladbach - Düsseldorf
Situation
Between Venlo and Mönchengladbach Hbf buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Friday, September 17, 2021 8:00 PM hours and Friday, October 8, 2021 10:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Venlo, Kaldenkirchen, Breyell, Boisheim, Dülken, Viersen and Mönchengladbach Hbf.
-
Sneltrein
20060 to 20099
Venlo - Hamm (Westf.)
- is cancelled between Venlo and Viersen
- runs less often between Viersen and Mönchengladbach Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Friday, September 17, 2021 8:00 PM and Friday, October 8, 2021 10:00 PM.