Engineering works: Schiphol - Leiden
Situation
Between Schiphol Airport and Leiden Centraal buses are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
In the night from Saturday to Sunday, April 7, 2024 between 2:30 AM and 5:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Schiphol Airport and Leiden Centraal.
- Intercity 1400 Utrecht C./Rotterdam C. - Rotterdam C./Utrecht C. is cancelled between Schiphol Airport and Leiden Centraal
- Intercity 701400 Rotterdam C./Leiden C. - Leiden C./Rotterdam C. runs as extra service between Leiden Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, April 7, 2024 2:30 AM and Sunday, April 7, 2024 5:30 AM.