engineering works

Engineering works: Venlo - Mönchengladbach - Düsseldorf

Situation

Between Venlo and Mönchengladbach Hbf buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Monday, April 15, 2024 9:35 AM hours and Thursday, April 25, 2024 2:00 AM hours.

Advice

This may affect your journey. Plan your journey in the (International) app.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, April 15, 2024 9:35 AM and Thursday, April 25, 2024 2:00 AM.