Engineering works: Venlo - Mönchengladbach - Düsseldorf
Situation
Between Venlo and Mönchengladbach Hbf buses are running due to engineering works.
The extra travel time is about 45 minutes.
Period
On Monday, September 9, 2024 between 8:30 PM and 11:50 PM hours.
Advice
Until early December, there will regularly be maintenance work between 20:30 and 06:00 during which buses will be used.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Venlo, Kaldenkirchen, Breyell, Boisheim, Dülken, Viersen and Mönchengladbach Hbf.
- Stoptrein 20000 to 20049 Düsseldorf Hbf/Arnhem C. - Arnhem C./Düsseldorf Hbf is cancelled between Venlo and Mönchengladbach Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Monday, September 9, 2024 8:30 PM and Monday, September 9, 2024 11:50 PM.