engineering works

Engineering works: Venlo - Mönchengladbach - Düsseldorf

Situation

Between Venlo and Mönchengladbach Hbf buses are running due to engineering works.
The extra travel time is about 45 minutes.

Period

On Monday, September 9, 2024 between 8:30 PM and 11:50 PM hours.

Advice

Until early December, there will regularly be maintenance work between 20:30 and 06:00 during which buses will be used.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Monday, September 9, 2024 8:30 PM and Monday, September 9, 2024 11:50 PM.