engineering works

Engineering works: Venlo - Mönchengladbach - Düsseldorf

Situation

Between Venlo and Mönchengladbach Hbf buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Friday, November 1, 2024 8:45 PM hours and Sunday, November 24, 2024 11:00 PM hours.

Advice

During weekends, trains do operate between Venlo and Mönchengladbach from 09:00 to 20:30.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, November 1, 2024 8:45 PM and Sunday, November 24, 2024 11:00 PM.